
Description
Here's the GSX Pro profiles for all variants of the Aerosoft Twin Otter. Cargo, Ski, Amphib, and Pax versions included for both the -300 and -100. For the pax versions i have also included separate profiles without a cargo loader, since normally the passengers or crew would hand load them onto the plane without using a belt loader. Expect heads to clip through the fuselage and cars to go into each other since passengers can't duck and GSX doesn't like these small planes.
To install move the folders within the cargo/pax folders into your %APPDATA%\Virtuali\Airplanes folder (press Win+R and paste the path in there if you don't know how to find it)
GSX Pro DHC-6 Twin Otter Profiles
Enhance your Aerosoft Twin Otter experience with GSX Pro DHC-6 profiles, covering all variants such as Cargo, Ski, Amphib, and Pax versions for the -300 and -100 models. Separate profiles are provided for passenger versions without a cargo loader. Note potential minor clipping issues due to aircraft size limitations in GSX. Simply move the folders into your designated Airplanes directory for installation.
User Reviews
1 reviews
Version History
No version history available.
Related

MPMG Marcos Gelabert Intl.
Enhance Marcus Gelabert International Airport in Panama with this add-on, featuring revamped aprons, ground markings, and added airport structures. Easily install and enjoy improved details like the Panamanian flag and control tower. Explore more sceneries in Panama from this hub of 99% of the countrys General Aviation traffic. Thank the creator and discover a new level of realism in MSFS.
by Ungeneer

PILOT'S DHC-7 Flight Model Improvement
Enhance the performance of your DHC-7 with this flight model improvement mod. Experience better STOL capabilities, realistic engine dynamics, and improved cockpit features based on real-world reference. Install it now to enjoy a more authentic flying experience in Microsoft Flight Simulator.
by Ungeneer

MPDA David Enrique Malek airport
Explore MPDA David Enrique Malek airport with this scenery add-on, featuring remade runway and apron, along with generic hangar models. Fly to popular tourist destinations like Boquete and beaches near David in Panama. Dont forget to also check out other sceneries by the developer for MPMG and MPRG. Enjoy your virtual flying experience!
by Ungeneer

Real WORLD Tour
Embark on a truly comprehensive global adventure with the Real WORLD Tour add-on, featuring airports of every capital in the world and covering all 195 UN countries + Taiwan. With a total distance of 88,912 nm, explore diverse landscapes and cultures as you chart your course through each leg of this epic journey. Plan your flights meticulously with provided .pln and .lnmpln files, and experience the thrill of a complete world tour in Microsoft Flight Simulator.
by Ungeneer


Log in to join the discussion
Log InComments(9)
almost 4 years ago
do i have to move the files to users/my user/appdata/local/packages/Microsoft.FlightSim file/localcache/simobjects/airplanes ????
almost 4 years ago
Nope. It's a folder in your appdata folder. To find it easily just press the windows key and R and then paste this in there: %APPDATA%\Virtuali\Airplanes
It should take you right to the folder where you need to drop the files
almost 4 years ago
I don't have this path?
over 3 years ago
what is the path? %APPDATA%\Virtuali\Airplanes turns up not there
over 3 years ago
the full path should be C:/Users/youruser/AppData/Roaming/Virtuali/Airplanes
about 4 years ago
Thank you for providing this profile for my favorite plane. However, the boarding process does not work properly (at least on my system): The pilots enter the plane, then shoot into heaven then come back and start a never ending moonwalk BACKWARDS. Thus, neither the stewardesses nor the passengers ever start boarding.
about 4 years ago
Great you created a GSX profile for the Twin Otter.
One can immediately see, where are the restrictions of
GSX: it offers only airport services for big airplanes.
It would be great if there came an expansion to smaller aircraft services.
Manually unloaded cargo and luggage. Passengers stepping in and out of the aircraft with slightly bowded heads to prevent headbumps...
There is so much different with smaller aviation...
Greetings
Bram Stikkel
about 4 years ago
Indeed it's a shame that smaller aircraft don't get the same attention. Strangely, I've seen the catering guys duck when entering planes with small doors, yet FSDT didn't think to do the same for passengers boarding a small plane.
about 4 years ago
O, yes, I have seen that too, indeed.
Well, I suppose it is a matter of a great number of requests at the develloper before they start thinking about a small aircraft capable expansion.
But I mentioned it already a few times to them, without any serious respionse, so...
But, one never knows!
Greetings
Bram