Airports→Intl. Airports
VRMM AIRPORT / NEW RUNWAY AND UPDATED TAXIWAYS , APRONS & GATES
VRMM AIRPORT / NEW RUNWAY AND UPDATED TAXIWAYS , APRONS & GATES The New Runway became operational by 6 October 2022, with a Boeing 777 operated by Emirates from Dubai, UAE, landing on the new Runway, with the existing runway being converted into a permanent taxiway, as TMA finished moving to the new seaplane terminal by August 2022. The old runway was closed by a departing Turkish Airlines Airbus A330 bound for Istanbul, Turkey. [29] The runway was developed by China's Beijing Urban Construction Group (BUCG) at a cost of USD 452 million. With the operationalization of the new runway, the waiting time between landing flights will be decreased from 15 minutes to 3 minutes. The previous runway only accommodated 8 flights per hour. Meanwhile, the new runway can accommodate 21 flights per hour.[30]